KERJA PEMBAIKAN CERUN MENGGUNAKAN KAEDAH “TIEBACK WALL (DOWNSLOPE) + SOIL NAIL (UPSLOPE)” DI LALUAN FT068 SEKSYEN 34.3 (34.8), JALAN KUALA LUMPUR – BENTONG (JALAN BENTONG LAMA), DAERAH GOMBAK, NEGERI SELANGOR.
PROJECT TITLE: KERJA PEMBAIKAN CERUN MENGGUNAKAN KAEDAH “TIEBACK WALL (DOWSLOPE) + SOIL NAIL (UPSLOPE)” DI LALUAN FT068 SEKSYEN 34.3 (34.8), JALAN KUALA LUMPUR – BENTONG (JALAN BENTONG LAMA), DAERAH GOMBAK, NEGERI SELANGOR CLIENT/ SUPERVISING ENGINEER (MAIN CONTRACTOR):Myzone Group Sdn Bhd PERIOD: 21/2/2025 – 20/8/2025 Job Scope: