PROJECT TITLE:
KERJA PEMBAIKAN CERUN MENGGUNAKAN KAEDAH “TIEBACK WALL (DOWSLOPE) + SOIL NAIL (UPSLOPE)” DI LALUAN FT068 SEKSYEN 34.3 (34.8), JALAN KUALA LUMPUR – BENTONG (JALAN BENTONG LAMA), DAERAH GOMBAK, NEGERI SELANGOR
CLIENT/ SUPERVISING ENGINEER (MAIN CONTRACTOR):
Myzone Group Sdn Bhd
PERIOD: 21/2/2025 – 20/8/2025
Job Scope:
- Soil nail
- Horizontal drain
- Guniting
- R.C Wall
- Micropile
- Gabion

