PROJECT TITLE:
Kerja-Kerja Menanam Rumput Pada Kawasan Lereng Bukit Di Stesen Penyelidikan Bukit Kuantan Pahang
CLIENT/ SUPERVISING ENGINEER ( MAIN CONTRACTOR):
Lembaga Getah Malaysia
PERIOD: 23/06/2020 – 11/11/2020
Job Scope:
- Prepare and clear the whole area to be turfed of all undesirable matter and trim to slope and required shapes.
- Selected top soil, spread, levelled and semi compacted on level ground.
- Close turfing to slope and embankment in 200mmx 200mm turves in chequered pattern including 300mm x 10mm diameter hardwood wooden nailing in slope area, treating with fertilizer, watering and tending until satisfactorily established