PROJECT TITLE:
Duta Ulu-Kelang Expressway (Duke) Phase 2, the soil nailing at MCTO alignment (for CBP type 3 & 3-1 and slope area) for Section 2 Tun Razak Link
CLIENT/ SUPERVISING ENGINEER ( MAIN CONTRACTOR):
Pembinaan Hamid Abd. Rahman Sdn Bhd
PERIOD: 01/12/2016 – 15/02/2017

